GOTG Pro Orb Installation Instructions

 

1. Remove lock bar, and playfield glass.

2. Flip playfield into service position to access the bottom of the playfield. Locate the LED wire behind the stock orb and trace it under the playfield, it should be plugged into the CN4 connector (LED 16,17,18). Unplug this connector and pull it so that it emerges through its hole and onto the playfield side. Flip playfield back down when done.

 

3. Locate the three screws behind the orb, pictured below, and remove them. Remove the bracket and the existing orb.

 

4. Remove the screw that holds the LED board and purple mini insert to the bracket and put them aside (they will not be reused). You may also need to snip off a black zip tie if your stock LED wire is being held to the bracket.

5. Remove the 4 screws that hold the stock orb to the bracket. Using these screws, attach the right side of the orb (the one with the wire) to the stock bracket. Next, place the crystal in the cavity of the right side orb. While holding the crystal, screw in the left side orb using the remaining 2 screws.

 

6. Route the new wire and connector through the hole and underneath the playfield. Place the bracket back in its original location and screw it back down using the 3 screws you removed earlier. 

7. Flip the playfield back into service position and locate the new connector. Insert it back into the CN4 connector. 

8. Turn on game and check to make sure the light is working. If it is, replace playfield glass, if not check connector CN4 to make sure it is seated properly. Enjoy Your New Orb!